I have a small trailer to myself for the next 6 weeks. With my own bathrom and all. It would be tight for a couple, but it works well for me. We started work today. I was roofing with two older men. We are over half done, should finish it up tomorrow. The house we are working on has pretty well been redone. More than half of the studding was replaced. Pretty well they only original parts are the floor, which was leveled and braced and the rafters. We have to wait for the plumbing and electrical before we can do much else on it.
Monday, October 29, 2007
Slidell
I have a small trailer to myself for the next 6 weeks. With my own bathrom and all. It would be tight for a couple, but it works well for me. We started work today. I was roofing with two older men. We are over half done, should finish it up tomorrow. The house we are working on has pretty well been redone. More than half of the studding was replaced. Pretty well they only original parts are the floor, which was leveled and braced and the rafters. We have to wait for the plumbing and electrical before we can do much else on it.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment